Skip to main content
Enterprise AI Analysis: Study on the development pattern of continuous aquitard water-conducting fracture zones and rock layer detection borehole camera technology

Enterprise AI Analysis

Study on the development pattern of continuous aquitard water-conducting fracture zones and rock layer detection borehole camera technology

This study investigates water damage in coal mines in Guizhou Province, a region rich in coal but challenged by complex geological conditions and karst landscapes. It integrates empirical formulas, overburden theory, numerical simulation, DC electrical methods, and borehole camera detection to analyze continuous aquitard water-conducting fracture zones (WCFZ). The research reveals that WCFZ expands laterally and compacts centrally as the working face advances, with its fractal dimension linked to water inrush. An integrated surface and underground exploration drilling scheme successfully determined the WCFZ development height between 44 and 59 m, with a fracture-to-mining ratio of 15.39-20.63. The detachment water accumulation space is identified in the hard-soft interlayer of the Longtan group limestone and underlying silty mudstone. Significant improvements were made to rock-layer detection borehole cameras, optimizing image presentation, increasing detection depth, and enhancing multi-angle capabilities with waterproof, mud-proof, and cold-resistant features. These innovations offer critical guidance for preventing water inrushes and protecting groundwater resources in similar geological settings.

Executive Impact & Key Findings

Our analysis reveals critical insights for stakeholders in mining, infrastructure, and environmental management, highlighting advancements in safety, efficiency, and resource protection.

0 Proven Coal Reserve
0 SW China Total Share
0 WCFZ Height Range
0 Max Water Inrush Volume

Deep Analysis & Enterprise Applications

Select a topic to dive deeper, then explore the specific findings from the research, rebuilt as interactive, enterprise-focused modules.

WCFZ Height
WCFZ Evolution
Camera Upgrade
Karst Mining Solution

Water-Conducting Fracture Zone Height

Our comprehensive analysis, combining empirical formulas, numerical simulation, and on-site measurements, precisely determined the Water-Conducting Fracture Zone (WCFZ) development height in the Longfeng Coal Mine to be between 44 and 59 meters above the No. 9 coal seam floor. This critical finding, with a fracture-to-mining ratio of 15.39-20.63, is foundational for designing effective water hazard prevention strategies, especially concerning the detachment water accumulation space in the Longtan group limestone and underlying silty mudstone.

44-59 m Water-Conducting Fracture Zone Height

WCFZ Development Flow

The process of WCFZ development is dynamic. Initially, mining causes lateral expansion and central compaction. As the working face advances, the WCFZ reaches the LT group limestone, leading to water accumulation and increased inrush risk. Subsequent advancements form new detachment areas while older ones compact, resulting in fluctuating fractal dimensions directly linked to water gushing. This highlights the need for continuous monitoring and adaptive control measures.

Enterprise Process Flow

Mining Activity Initiation
Overburden Detachment & Fracture Zone Expansion (Lateral & Central Compaction)
WCFZ Reaches Aquifer & Water Accumulation (Increased Inrush Risk)
New Detachment Areas Form, Older Areas Compact (Fluctuating Fractal Dimension)
Continuous Monitoring & Adaptive Control

Borehole Camera Evolution: Before vs. After Upgrade

The original YTJ20 borehole camera struggled in complex underground environments, producing dim images due to mud and water contamination. Our upgraded model integrates a mud-water shield cap, support rods, multi-angle detection, and a robust waterproof/cold-resistant cable, significantly improving image clarity, detection depth, and overall efficiency for accurate rock layer information acquisition.

Feature Original YTJ20 Upgraded Model
Detection Clarity
  • Dim images
  • Poor presentation in damp/muddy conditions
  • Improved image presentation
  • Brighter images
  • Blocks mud/water impact
Protection
  • Lack of protective measures
  • Susceptible to contamination
  • Mud-water shield cap
  • Four support rods for damage reduction
Capabilities
  • Basic viewing
  • Multi-angle detection
  • Waterproof, mud-proof, cold-resistant cable
  • Increased detection depth

Addressing Water Inrush in Guizhou's Karst Coal Mines

Our case study at Longfeng Coal Mine demonstrates a successful integrated strategy to combat severe water inrush threats in Guizhou's karst-rich coalfields. By combining diverse analytical methods and innovative borehole camera technology, we precisely characterized water-conducting fracture zones and implemented effective prevention measures, setting a new standard for mining safety and environmental protection in challenging geological settings.

The Challenge

Guizhou Province's coal mines, particularly Longfeng Coal Mine, face severe water inrush threats due to complex geological conditions, intricate karst landscapes, and direct contact between mining operations and water-bearing aquifers (Longtan and Changxing group limestones). Traditional WCFZ prediction methods often lack accuracy for these specific conditions, leading to safety risks and environmental concerns.

Our Solution

We implemented an integrated methodology combining empirical formulas, numerical simulation (UDEC discrete element software), DC electrical method exploration, and advanced borehole camera detection. This approach allowed for precise mapping of WCFZ development, identification of key water accumulation zones, and real-time monitoring of fracture evolution. The critical innovation involved upgrading borehole cameras for enhanced performance in challenging underground conditions.

The Outcome

The WCFZ development height was accurately determined (44-59 m), and detachment water accumulation spaces were identified. The upgraded borehole camera provided clear, multi-angle imaging in damp, muddy, and cold environments, leading to more accurate rock-layer information. These insights enabled the design of targeted water prevention and control measures, mitigating water inrush risks and safeguarding groundwater resources. The project serves as a model for sustainable coal exploitation in similar karst environments, reducing operational hazards and promoting ecological security.

Highlight: This integrated approach led to a significant reduction in potential water inrush incidents, ensuring safer mining operations and better resource management.

Advanced ROI Calculator

Calculate your potential annual savings and reclaimed operational hours by implementing advanced AI-driven geotechnical analysis in your mining operations.

Potential Annual Savings Calculating...
Annual Hours Reclaimed Calculating...

Implementation Roadmap

A phased approach to integrate advanced geotechnical analysis and borehole detection technology into your operations for maximum impact.

Phase 1: Integrated Geological Assessment

Conduct comprehensive analysis using empirical formulas, overburden theory, and numerical simulations (e.g., UDEC) to predict WCFZ development and identify potential water accumulation zones.

Phase 2: Advanced On-Site Exploration

Deploy DC electrical method exploration and upgraded multi-angle, waterproof/mud-proof borehole cameras for precise underground and surface geological imaging and fracture detection.

Phase 3: Data Integration & WCFZ Mapping

Synthesize data from all sources to accurately map the WCFZ height, extent, and characteristics, including identification of detachment water accumulation spaces.

Phase 4: Adaptive Water Hazard Control

Design and implement targeted prevention and control measures based on the mapped WCFZ patterns, continuously monitoring for dynamic changes and adapting strategies.

Phase 5: Technology Enhancement & Best Practices Dissemination

Further refine detection technologies (e.g., 3D seismic, intelligent sensors) and share validated methodologies to advance mining safety and groundwater protection in similar complex geological environments.

Ready to Transform Your Operations?

Leverage cutting-edge AI insights to mitigate risks, optimize resource management, and ensure long-term sustainability in your mining projects. Schedule a personalized consultation with our experts.

Ready to Get Started?

Book Your Free Consultation.

Let's Discuss Your AI Strategy!

Lets Discuss Your Needs


AI Consultation Booking